The Alternative Fuels Infrastructure Regulation (AFIR) sets a clear requirement for electric vehicle charging across Europe’s primary road network. Since 2025, AFIR obligates that fast charging stations providing at least 150 kW for cars and vans must be available every 60 km along the main corridors of the TEN-T network. This rule remains effective for all subsequent years, including 2027. No new or additional deadline for 2027 is established, and the law does not guarantee every corridor will have uninterrupted charging or perfect coverage by that year.

What AFIR Says—And What It Does Not

The 150 kW/60 km minimum is a legal baseline starting in 2025. However, AFIR does not assure that every EV user can count on universal coverage or instant charger availability on every trip. The Council’s summary does not establish that a particular charger will be working, unoccupied or suitable for every car when a driver arrives. Users must therefore perform route-specific and vehicle-specific checks before departure.

How Drivers Should Prepare for 2027 Road Trips

Drivers planning cross-border or long-distance travel in 2027 should:

  • Use real-time route-planning tools to check charger locations and live status.
  • Confirm that chargers support the correct connector type for their specific EV model.
  • Prepare for payment situations: have accepted cards, apps, or RFID solutions ready, and check the payment methods shown by the operator.
  • Have backup charging plans in case a location is out of service or fully occupied.

Q&A: Will Every TEN-T Corridor Offer Guaranteed Fast Charging in 2027?

No. While the AFIR regulation establishes the minimum infrastructure from 2025 onwards, temporary gaps or operational issues can still occur due to factors like maintenance, technical faults, or specific compatibility issues. Always check both your route and your vehicle’s requirements before travel.

For the full regulation text and implementation details, see the official AFIR update on the Council of the European Union’s website.

Lead image: AI-generated editorial illustration; it does not document the named product or a real facility.